Capacity & Energy – High Yield provides the same program advantages as Option 3a but carries the risk of a penalty in exchange for higher capacity payments.
Capacity & Energy incorporates the NYISO's Special Case Resources Program (SCR). Capacity programs are a key component to keep electric power flowing in New York State, especially during periods of high electric demand.
Capacity & Energy is a partnership between NYPA, the participant, the NYISO and Con Edison. This option is appropriate for customers throughout New York State with the capability of providing load reductions for payment during the summer, the winter, or throughout the year.
Participants in this option that are located in Con Edison service territory may also be eligible to participate in Con Ed's Distributed Load Relief Program and have the potential to earn additional bonus incentive payments.
| REQUIREMENTS
Minimum KW |
|
Minimum of 10 kW (must be measurable) |
|
| Curtailment method | On-site generation and/or interruptible loads |
| Permitting | Generators require proper permitting by NYS DEC and applicable local permitting requirements |
| Location | New York State |
| Curtailment period | January 1st – December 31st, any day, any hours. Customers can enroll based on Summer (May - October) and Winter (November - April) capability periods. |
| INCENTIVE |
|
| NOTIFICATION | Two hour notification of activation with a 21-hour day-ahead advisory alert |
| NUMBER OF EVENTS | Unlimited |
| DURATION OF EVENTS |
|
| DERATING | If the participant is unable to reduce its full committed amount during four consecutive hours of all events (plus the mandatory one-hour test), it may be subject to a derating adjustment, which could limit the potential capacity payment in future Capability Periods. |
| PENALTIES |
|
| MONITORING & VERIFICATION
Method |
|
Review of hourly interval metering |
|
| Required Equipment | Installed integrated hourly metering device |
| Cost of Equipment | Participant is responsible for cost of installation of metering equipment (if necessary) |
| Option 1 | Option 2 | Option 3a | Option 3b |