NY.gov Portal State 

Agency Listing Search all of NY.gov
PLM Logo

Contact Us:
For NYPA Business Customers

OPTION 3b: Capacity & Energy - High Yield

Capacity & Energy – High Yield provides the same program advantages as Option 3a but carries the risk of a penalty in exchange for higher capacity payments.

Capacity & Energy incorporates the NYISO's Special Case Resources Program (SCR). Capacity programs are a key component to keep electric power flowing in New York State, especially during periods of high electric demand.

Capacity & Energy is a partnership between NYPA, the participant, the NYISO and Con Edison. This option is appropriate for customers throughout New York State with the capability of providing load reductions for payment during the summer, the winter, or throughout the year.

Participants in this option that are located in Con Edison service territory may also be eligible to participate in Con Ed's Distributed Load Relief Program and have the potential to earn additional bonus incentive payments.

Option 3b
REQUIREMENTS

Minimum KW

 

Minimum of 10 kW (must be measurable)

Curtailment method

On-site generation and/or interruptible loads

Permitting

Generators require proper permitting by NYS DEC and applicable local permitting requirements

Location

New York State

Curtailment period

January 1st – December 31st, any day, any hours. Customers can enroll based on Summer (May - October) and Winter (November - April) capability periods.

INCENTIVE
  1. Capacity Payments: For the facility's pledged capacity, 95% of the NYISO Monthly auction clearing price for each month enrolled.
  2. Energy Payments: For verified performance by the facility during the greater of $0.50/kWh or 100% of the market price during each hour of the event. The customer will also be paid 100% of the market price for participating in mandatory one-hour tests.
  3. Bonus Payments: If participating facility is in Con Ed service territory, may be eligible for participation in Con Ed's Distributed Load Relief Program (DLRP). Additional payments can range from $2-5/kW-month depending on the facility's location and participation.

    Payment will be made at the end of each capability period, provided that NYPA has been paid by or received a credit from NYISO and/or Con Ed.
NOTIFICATION

Two hour notification of activation with a 21-hour day-ahead advisory alert

NUMBER OF EVENTS

Unlimited

DURATION OF EVENTS
  • Min = 1 Hour
  • Max = Unlimited
DERATING

If the participant is unable to reduce its full committed amount during four consecutive hours of all events (plus the mandatory one-hour test), it may be subject to a derating adjustment, which could limit the potential capacity payment in future Capability Periods.

PENALTIES
  • Deficiency Penalty – If the participant does not demonstrate its full committed amount for one full hour during an event (or test), it may face a penalty of 1.5 times the spot market price for the amount of the capacity found deficient.
  • Any penalties assessed by the NYISO will be passed through to the participant.
MONITORING & VERIFICATION

Method

 

Review of hourly interval metering
data will validate performance

Required Equipment

Installed integrated hourly metering device

Cost of Equipment

Participant is responsible for cost of installation of metering equipment (if necessary)



 

Option 1 Option 2 Option 3a Option 3b