New York Power Authority

 

Approved Budget and Financial Plan

2009-2012

(in compliance with 2 NYCRR Part 203)

 

  

 

Background and Mission Statement

 

NYPA’s Four-Year Projected Income Statements

 

2009 Budget – Sources and Uses

 

NYPA’s Four-Year Projected Cash Budgets

 

NYPA’s Relationship with the New York State Government

 

Budget Process                                                                 

 

Budget Assumptions  

 

Self-Assessment of Budgetary Risks

 

Revised Forecast of 2008 Budget

 

Reconciliation of 2008 Budget and 2008 Revised Forecast

 

Statement of 2007 Financial Performance

 

Employee Data

 

Gap-Closing Initiatives

 

Material Non-recurring Resources

 

Shift in Material Resources

 

Debt Service

 

Capital Investments and Sources of Funding

 

Certification of Assumptions and Method of Estimation

 



Background and Mission of the Power Authority of the State of New York

 

The Power Authority of the State of New York’s (“NYPA” or “Authority”) mission is to provide clean, economical and reliable energy consistent with its commitment to safety, while promoting energy efficiency and innovation, for the benefit of its customers and all New Yorkers. The Authority's financial performance goal is to have the resources necessary to achieve its mission, to maximize opportunities to serve its customers better, and to preserve its strong credit rating. 

 

NYPA generates, transmits and sells electric power and energy principally at wholesale. The Authority’s primary customers are municipal and investor-owned utilities and rural electric cooperatives located throughout New York State, high load factor industries and other businesses, various public corporations located within the metropolitan area of New York City (“SENY governmental customers”), and certain out-of-state customers.

 

To provide electric service, the Authority owns and operates six major generating facilities, eleven small gas-fired electric generating facilities, and five small hydroelectric facilities and a number of transmission lines, including major 765-kV and 345-kV transmission facilities. The most recent addition to the generation stock is a new combined-cycle electric generating plant in New York City that has a nominal capacity rating of 500 MW (the ‘‘500-MW Project’’) and that entered into commercial operation on December 31, 2005.  NYPA’s other five major generating facilities consist of two large hydroelectric facilities (“Niagara” and “St. Lawrence-FDR”), a large pumped-storage hydroelectric facility (“Blenheim-Gilboa”) and two oil-and-gas-fired facilities in New York City (“Poletti Project”) and Long Island (“Flynn Project”).  

 

In addition to Authority-supplied electricity, further customer electric energy needs are met by purchases from in-state generating companies, municipal electric systems, and out-of-state generating companies; principally via participation in the New York Independent System Operator (“NYISO”) market.  Also, a small amount of such energy is received from customer-owned generation.

 

To maintain its position as a low cost provider of power in a changing environment, the Authority has undertaken and continues to carry out a multifaceted program, including: (a)  the upgrade and re-licensing of the Niagara and St. Lawrence-FDR projects; (b) long-term supplemental electricity supply agreements with its governmental customers located mainly within the City of New York (“NYC governmental customers”); (c) the construction of the 500-MW Project; (d) a significant reduction of outstanding debt; and (e) implementation of an energy and fuel risk management program. 

 

To achieve its goal of promoting energy efficiency, NYPA implements two energy services programs, one for its SENY governmental customers and the other for various other public entities throughout the State. Under these programs, the Authority finances the installation of energy saving measures and equipment, which are owned by the customers and public entities upon their installation and which focus primarily on the reduction of the demand for electricity. These programs generally provide funding for, among other things, high efficiency lighting technology conversions, high efficiency heating, ventilating and air conditioning systems and controls, boiler conversions, replacement of inefficient refrigerators with energy efficient units in public housing projects, distributed generation technologies and clean energy technologies, and installation of non-electric energy saving measures.

 

Participants in these energy efficiency programs include departments, agencies or other instrumentalities of the State, the Authority’s SENY governmental customers, the Authority’s municipal electric system customers, public school districts or boards and community colleges located throughout New York State, county and municipal entities with facilities located throughout New York State, and various business/industrial customers of the Authority. By recently enacted legislation, the Authority is also authorized to engage in (1) energy efficiency services and clean energy technologies projects for public and non-public elementary and secondary schools in New York, (2) energy efficiency and conservation services and projects involving facilities using conventional or new energy technologies for certain specified military establishments in New York, and (3) replacement of inefficient refrigerators with energy efficient units in certain public and private multiple dwelling buildings.

 

On February 24, 1998, the Authority adopted its “General Resolution Authorizing Revenue Obligations” (as amended and supplemented, the “Bond Resolution”).  The Authority has covenanted with bondholders under the Bond Resolution that at all times the Authority shall maintain rates, fees or charges, and any contracts entered into by the Authority for the sale, transmission, or distribution of power shall contain rates, fees or charges sufficient together with other monies available therefor:

 

(i)         to pay all Operating Expenses of the Authority,

(ii)        to pay the debt service on all Senior Indebtedness and the debt service  on all Subordinated Indebtedness then outstanding, and all Parity Debt and Subordinated Contract Obligations, all as the same respectively become due and payable, and

(iii)      to maintain any reserve established by the Authority pursuant to the General Resolution, in such amount as may be determined from time to time by the Authority in its judgement.

 

 

 

 

 

NYPA’s Four-Year Projected Income Statements

(in Millions)

 

 

 

 

     2009

     2010

     2011

     2012

Operating Revenues:

 

 

 

 

 

  Customer Revenues

$2,111.8

$2,277.6

$2,347.8

$2,404.6

  NYISO Market Revenues

$953.3

$717.2

$1,055.0

$1,124.2

Total Operating Revenues

$3,065.1

$2,994.7

$3,402.8

$3,528.8

 

 

 

 

 

 

 

Operating Expenses:

 

 

 

 

 

  Purchased Power

($1,257.6)

($1,338.2)

($1,377.5)

($1,355.1)

  Fuel oil and gas

($553.8)

($373.9)

($621.2)

($696.1)

  Wheeling Expenses

($418.5)

($423.0)

($427.5)

($432.1)

  O&M Expenses

($304.5)

($300.3)

($309.5)

($325.8)

  Other Expenses

($240.4)

($225.7)

($312.3)

($351.7)

  Depreciation and Amortization

($158.7)

($159.3)

($158.2)

($158.4)

  Allocation to Capital

$7.6

$7.6

$6.6

$9.7

Total Operating Expenses

($2,925.9)

($2,812.9)

($3,199.7)

($3,309.5)

 

 

 

 

 

 

 

NET OPERATING REVENUES

$139.2

$181.9

$203.1

$219.3

 

 

 

 

 

 

 

Other Income:

 

 

 

 

 

  Investment Income

$43.1

$58.2

$73.1

$80.8

  Other Income

$96.5

$95.9

$95.2

$93.9

Total Other Income

$139.5

$154.2

$168.3

$174.7

 

 

 

 

 

 

 

Interest Expense:

 

 

 

 

  Interest Expense

($105.7)

($108.2)

($114.5)

($115.9)

Total Interest Expense

($105.7)

($108.2)

($114.5)

($115.9)

 

 

 

 

 

 

 

NET REVENUES

$173.1

$227.8

$257.0

$278.1

 


 

 

2009 Budget – Sources

(in Millions)

 

 

 

 

2009 Budget – Uses

(in Millions)


 

NYPA’s Four-Year Projected Cash Budgets

(in Millions)

 

 

 

 

 

      2009

      2010

      2011

      2012

Revenue Receipts:

 

 

 

 

 

 

     Sale of Power, Use of Transmission Lines,

 

 

 

 

          Wheeling Charges and other receipts

$3,065.1

$2,994.7

$3,402.8

$3,528.8

     Earnings on Investments and Time Deposits

$49.7

$65.2

$80.4

$87.8

Total Revenues

$3,114.8

$3,059.9

$3,483.2

$3,616.6

 

 

 

 

 

 

 

 

Expenses:

 

 

 

 

 

 

 

    Operation and Maintenance, including

 

 

 

 

         Transmission of Electricity by others,

 

 

 

 

         Purchased Power and Fuel Purchases

($2,752.8)

($2,641.7)

($3,030.0)

($3,141.9)

 

 

 

 

 

 

 

 

Debt Service:

 

 

 

 

 

 

     Interest on Bonds and Notes

($95.3)

($95.3)

($97.3)

($97.4)

     General Purpose Bonds Retired

($103.6)

($127.5)

($106.4)

($103.5)

     Notes Retired

($6.5)

($7.0)

($7.6)

($8.2)

Total Debt Service

($205.4)

($229.8)

($211.3)

($209.1)

 

 

 

 

 

 

 

 

Total Requirements

($2,958.2)

($2,871.5)

($3,241.3)

($3,351.0)

 

 

 

 

 

 

 

 

NET OPERATIONS

$156.6

$188.4

$241.9

$265.6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Capital Receipts:

 

 

 

 

 

 

    Sale of Bonds, Promissory Notes & Commercial  Paper

$120.6

$130.0

$150.0

$200.0

    Less : Repayments

($112.3)

($79.9)

($70.7)

($70.3)

    Earnings on Construction Funds

$5.8

$4.6

$3.8

$3.6

    DSM Recovery Receipts

$35.8

$33.7

$30.3

$25.2

    Other

$102.0

$102.0

$102.0

$102.0

Total Capital Receipts

$151.9

$190.4

$215.4

$260.5

 

 

 

 

 

 

 

 

Capital Additions & Refunds:

 

 

 

 

 

     Additions to Electric Plant in Service and

 

 

 

 

          Construction Work in Progress, and Other costs

($313.8)

($311.0)

($273.0)

($397.4)

     Construction Escrow

$91.3

$82.9

$52.4

$98.8

Total Capital Additions & Refunds

($222.5)

($228.1)

($220.6)

($298.6)

 

 

 

 

 

 

 

 

NET CAPITAL

($70.6)

($37.7)

($5.2)

($38.1)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NET INCREASE / (DECREASE)

$86.0

$150.7

$236.7

$227.5

 


 

(a) NYPA’s Relationship with the New York State Government

 

NYPA is a corporate municipal instrumentality and political subdivision of the State of New York created in 1931 and authorized by the Power Authority Act of the State of New York (the ‘‘Power Authority Act’’) to help provide a continuous and adequate supply of dependable electric power and energy to the people of New York State.  The Authority’s operations are overseen by seven Trustees.  NYPA’s Trustees are appointed by the Governor of the State, with the advice and consent of the State Senate. The Authority is a fiscally independent public corporation that does not receive State funds or tax revenues or credits. NYPA generally finances construction of new projects through sales of bonds and notes to investors and pays related debt service with revenues from the generation and transmission of electricity.  Income of the Authority and properties acquired by it for its projects are exempt from taxation.  However, the Authority is authorized by Chapter 908 of the Laws of 1972 to enter into agreements to make payments in lieu of taxes with respect to property acquired for any project where such payments are based solely on the value of the real property without regard to any improvement thereon by the Authority and where no bonds to pay any costs of such project were issued prior to January 1, 1972.

 

 

(b) Budget Process

 

As an electric utility, NYPA operates in a capital intensive industry where operating revenues and expenses are significant and highly variable due to the volatility of electricity prices and fuel costs.  NYPA’s operations are not only subject to electric and fuel cost volatility, but changing water flows have a direct effect on hydroelectric generation levels.  The proposed budget and financial plan relied on an early July snapshot of these inputs, while the approved budget and financial plan utilizes an early October snapshot of electric and fuel prices and water levels on Lake Erie and Lake Ontario.  The Authority’s experiences with these markets and conditions have shown that they can significantly change over time and therefore substantial differences in operating revenues and expenses between the proposed and approved budget and financial plans are to be expected.

 

The following is a general outline of the schedule of actions for both the proposed and approved budget forecast for 2009 and the overall four year financial plan for 2009-2012:

 

Proposed Budget and Financial Plan

·          During July – August 2008 developed preliminary forecasts of electric prices (both energy and capacity) and fuel expenses; NYPA customer power and energy use; NYPA customer rates; generation levels at NYPA power projects reflecting scheduled outages; and purchased energy & power requirements and sources.

·          During July – August 2008 developed preliminary operations & maintenance and capital expense targets.

·          During August – September 2008 integrated above data to produce the budget and financial valuations.

·          September 23, 2008 approval by NYPA’s Trustees to submit the proposed budget and financial plan for public inspection at five convenient locations and on NYPA’s internet website.

 

 Approved Budget and Financial Plan

·          During October – November 2008 updated forecasts of electric prices (both energy and capacity) and fuel expenses; NYPA customer power and energy use; NYPA customer rates; generation levels at NYPA power projects reflecting scheduled outages; and purchased energy & power requirements and sources.

·          During October – November 2008 finalized operations & maintenance expenses and capital costs estimates.

·          In November – December 2008 integrated above data to produce updated budget and financial valuations as well as produced sensitivity (scenario) valuations.

·          December 16, 2008 – authorization of NYPA’s Trustees to approve the updated budget and financial plan; submit the document to the State Comptroller’s Office; and make the document available for public inspection and on NYPA’s internet website.

 

 

(c) Budget Assumptions

 

NYISO Revenue and Expenses

The Authority schedules power to its customers and buys and sells energy in an electricity market operated by the NYISO. The majority of NYPA’s operating expenses are due to various NYISO purchased power charges in combination with generation related fuel expenses.  A significant amount of the Authority’s revenues result from sales of the Authority’s generation into the NYISO market.

 

In order to budget these expenses and revenues, the Authority utilizes a customized economic statistical software package that develops forward price curves.  The software package develops forecasts of fuel costs, NYISO super-zone load projections, and wholesale electricity prices and simulates the economic dispatch of statewide generation resulting from these supply and demand factors.  Employing a probabilistic approach to uncertainty through the use of multiple scenarios for loads, fuel prices, and other key inputs, this software package is particularly designed to provide not only price forecasting, but also the crucial underlying volatility data required for accurate valuation of power contracts, generating assets, and energy derivative products.  For budget purposes, the prices of the multiple scenarios are averaged to produce an expected value. Key outputs of the software are:

 

·          Forecasts of expected electric price and associated uncertainty for each NYISO super-zone.

·          Monte Carlo like scenarios of NYISO super-zone loads and electric and fuel prices that efficiently span the range of reasonable possibilities.

·          Transmission flows within the NYISO and between the NYISO and external entities.

·          Operating margin for specific plants over a period of time.

·          Conditional expectations of peak loads in future years.

·          Capacity additions commensurate with the above conditional expectations.

·          Supply curves (cost vs. load) for specific hours and scenarios.

·          Power generated by specific plants over a period of time.

 

In addition to the economic software package, NYPA employs additional hydrologic, hydraulic and statistical modules and models to forecast the generation levels at its Niagara and St. Lawrence-FDR hydroelectric projects.  The level of hydroelectric generation is one of the more important determinative factors to the Authority’s net revenue position.

 

Customer and Project Revenue

The customers projected to be served by the Authority for the financial plan period 2009-2012 and the rates paid by such customers vary with the NYPA facilities designated to serve such loads.

 

St. Lawrence-FDR and Niagara Customers. Power and energy from the St. Lawrence-FDR and Niagara hydroelectric facilities are sold to investor-owned electric utilities, municipal electric systems, rural electric cooperatives, industrial customers, certain public bodies, and out-of-state public customers.  The charges for firm power and associated energy sold by the Authority to the investor-owned utility companies for the benefit of rural and domestic customers, the municipal electric systems and rural electric cooperatives in New York State, two public transportation agencies, and seven out-of-state public customers have been established in the context of an agreement settling litigation respecting rates for hydroelectric power, judicial orders in that litigation, and contracts with certain of these customers. Essentially, the “settlement agreement” and relevant judicial orders preclude the inclusion of any expense associated with debt service for non-hydroelectric projects in the hydroelectric rates charged to wholesale customers for the benefit of rural and domestic customers, but specifically permit the inclusion of interest on indebtedness and continuing depreciation and inflation adjustment charges with respect to the capital costs of Niagara and St. Lawrence-FDR. For the purposes of the 2009-2012 financial plan, rate changes were incorporated as of May 1st for each of the four years based on the ratemaking principles established in the settlement agreement.

 

The basic rates for Niagara expansion and replacement power industrial customers and St. Lawrence-FDR industrial customers are subject to annual adjustment in May of each year based on contractually agreed upon economic indices.  For purposes of the four-year financial plan, projections were made concerning the movements and magnitudes of these indices.

 

SENY Governmental Customers. Power and energy purchased by the Authority in the NYISO capacity and energy markets, as supplemented by sales of power and energy by Authority resources at Poletti, the 500-MW Project, the small hydro projects and Blenheim-Gilboa, are sold to various municipalities, school districts and public agencies in the New York City and Westchester County area.

 

In 2005, the Authority and its major New York City governmental customers entered into long-term supplemental electricity supply agreements (“2005 LTA”). Under the 2005 LTA, the NYC governmental customers agreed to purchase their electricity from the Authority through December 31, 2017, with the NYC governmental customers having the right to terminate service from the Authority at any time on three years’ notice and, under certain limited conditions, on one year’s notice, provided that they compensate the Authority for any above-market costs associated with certain of the resources used to supply the NYC governmental customers.

Under the 2005 LTA, the Authority will modify rates annually through a formal rate proceeding before the Authority if there is a change in fixed costs to serve the New York City governmental customers. Generally, changes in variable costs, which include fuel and purchased power, will be captured through contractual pricing adjustment mechanisms. Under these mechanisms, actual and projected variable costs are reconciled and all or a portion of the variance is either charged or credited to the NYC governmental customers. The NYC governmental customers are committed to pay for any supply secured for them by the Authority which results from a collaborative effort.

Effective January 1, 2007, the Authority entered into a new supplemental electricity supply agreement with Westchester County.  Under the new agreement, Westchester County will remain a full requirements customer of NYPA through at least December 31, 2009.  The Authority may modify the rates charged the customer pursuant to a specified procedure; an energy charge adjustment mechanism is applicable; the customer is committed to pay for any supply resources secured for it by the Authority under a collaborative process; and NYPA will continue to make available financing for energy efficiency projects and initiatives, with costs thereof to be recovered from the customer.  The Authority expects that all of the other Westchester governmental customers will execute this form of agreement.

For purposes of the four year financial plan it is assumed that the New York City and Westchester customers will continue to be served and rates set to produce the projected net revenue position for each year.

Market Supply Power Customers.  The Authority administers an array of power programs for economic development that supply power to businesses and to not-for-profit institutions in New York State. Currently more than 400,000 jobs across the Empire State are linked to these power programs.  For a number of these customer programs such as the Economic Development Power program, the High Load Factor Power program, the Municipal Development Agency Power program, and the Power for Jobs program, the Authority has no physical assets to supply power and energy to these customers and NYPA must buy these products in the NYISO market or negotiate bilateral arrangements with other power suppliers.

 

Many of the programs or the individual contracts of the business customers served under these programs are set to expire during the financial plan timeframe.  However, the Authority assumes that the State Legislature will maintain a leading role for NYPA in fostering economic development over the 2009-2012 forecast period.  Resultantly, NYPA has modeled the business customers and the not-for-profit institutions as continuing to be served.

 

Blenheim-Gilboa Customers.  The Authority uses all but 50 MW of the Blenheim-Gilboa Pumped Storage Power Project output to meet the requirements of the Authority’s business and governmental customers and to provide services in the NYISO market. The Authority also has a contract for the sale of 50 MW of firm capacity from the Blenheim-Gilboa Project to the Long Island Power Authority (“LIPA”).  Service under the contract with LIPA commenced on April 1, 1989 and will terminate April 30, 2015, unless terminated by LIPA upon not less than 6 months advance notice.  For purposes of the four-year financial plan it is assumed that the LIPA contract is not terminated and the current charges remain in effect throughout the forecast horizon.

 

Small Clean Power Plants (“SCPPs”).  To meet capacity deficiencies and ongoing local requirements in the New York City metropolitan area, which could also adversely affect the statewide electric pool, the Authority placed in operation, in the summer of 2001, eleven 44-MW natural-gas-fueled SCPPs at various sites in New York City and one site in the service territory of LIPA.  It is anticipated that for the entire 2009-2012 period, two of these plants will be retired pursuant to an agreement with New York City.

 

For the 2009 through 2012 forecast period,  the installed capacity of the remaining SCPPs is used by the Authority to meet its NYISO mandated installed capacity needs or, if not needed for that purpose, is subject to sale to other users via bilateral arrangements or by sale into the NYISO capacity auction. NYPA sells the energy produced by the SCPPs into the NYISO energy market.  

 

Flynn. The Flynn Project is a combined-cycle facility with a nameplate rating of 164 MW. The Authority is supplying the full output of the Project to LIPA pursuant to a capacity supply agreement (the ‘‘CS Agreement’’) between the Authority and LIPA, which commenced in 1994 and had an initial term of 20 years.  The CS Agreement was amended, effective January 1, 2004, by an agreement, which extended the CS Agreement to April 30, 2020. The amended agreement modified the pricing provisions for the period January 1, 2004 to December 31, 2008 and either party has the right to terminate the extension on or before April 30, 2012.  Negotiations are proceeding and are near finalization to amend the pricing provisions of the CSA through December 31, 2014.

For purposes of the four-year financial plan it is assumed that the agreement between LIPA and NYPA remains in effect throughout the period.

 

Transmission Project. The Authority owns approximately 1,400 circuit miles of high voltage transmission lines, more than any other utility in New York State, with the major lines being the 765-kV Massena-Marcy line, the 345-kV Marcy-South line, the 345-kV Niagara-to-Edic transmission line, and the 345-kV Long Island Sound Cable.

 

In an Order issued January 27, 1999, FERC approved the use of the Authority’s present transmission system revenue requirement in developing the rates for service under the NYISO tariff.  FERC also approved, among other things, the imposition of the NYPA Transmission Adjustment Charge (“NTAC”) and the NYPA Transmission Service Charges (“TSC”) which are the tariff elements set aside to aid in the full recovery of the Authority’s annual transmission revenue requirement.

With the implementation of the NYISO arrangement in November 1999, all transmission service over the Authority’s facilities is either pursuant to the NYISO tariffs or pre-existing Authority contracts with NYPA realizing its $165 million annual revenue requirement via the NTAC, TSC or through existing customer contracts.  For purposes of the four-year financial plan it is assumed that these revenue producing vehicles remain in effect and the Authority earns its annual revenue requirement. 

 

Investment and Other Income

Investment Income.  Investment of the Authority’s funds is administered in accordance with the applicable provisions of the Bond Resolution and with the Authority’s investment guidelines. These guidelines comply with the New York State Comptroller’s investment guidelines for public authorities and were adopted pursuant to Section 2925 of the New York Public Authorities Law. The Authority’s investments are restricted to (a) collateralized certificates of deposit, (b) direct obligations of or obligations guaranteed by the United States of America or the State of New York, (c) obligations issued or guaranteed by certain specified federal agencies and any agency controlled by or supervised by and acting as an instrumentality of the United States government, and (d) obligations of any state or any political subdivision thereof or any agency, instrumentality or local government unit of any such state or political subdivision which is rated in any of the three highest long-term rating categories, or the highest short-term rating category, by nationally recognized rating agencies.   The Authority’s investments in the debt securities of Federal National Mortgage Association (FNMA) and Federal Home Loan Mortgage Corp. (FHLMC) were rated Aaa by Moody’s Investors Services (Moody’s) and AAA by Standard & Poor’s (S&P) and Fitch Ratings (Fitch).  All of the Authority’s investments in U.S. debt instruments are issued or explicitly guaranteed by the U.S. Government.

 

Other Income.  On November 21, 2000 (“Closing Date”), the Authority sold its nuclear plants (Indian Point 3 and James A. FitzPatrick Projects) to two subsidiaries of the Entergy Corporation for cash and non-interest bearing notes totaling $967 million maturing over a 15-year period. The present value of these payments recorded on the Closing Date, utilizing a discount rate of 7.5%, was $680 million.  On an accrual basis the Authority expects to recognize interest income of  $17.8 million in 2009, $16.9 million in 2010, $15.9 million in 2011and 14.9 million in 2012. On a cash basis the Authority projects to receive $30 million payments in each year from 2008 through 2011.

 

As part of the Authority’s sale in 2000 of its two nuclear plants, the Authority entered into two “value sharing agreements” (“VSAs”) with the Entergy subsidiaries. In essence, the agreements provide that Entergy subsidiaries will share with the Authority a certain percentage of all revenues they receive from power sales from the nuclear plants in excess of specific projected power prices for a 10 year period, covering 2005 – 2014.  The Authority and the Entergy subsidiaries disputed the sharing amounts for 2005 and 2006 and the dispute was submitted to arbitration consistent with terms of the VSAs.   During the arbitration period, NYPA and the Entergy subsidiaries also engaged in settlement discussions that ultimately resulted in a settlement of the dispute and the amendment of the VSAs.  In essence, these amended VSAs provide for Entergy to pay the Authority a set price ($6.59 per MWh for Indian Point 3 and $3.91 per MWh for FitzPatrick) for all MWhs metered from each plant between 2007 and 2014, with the Authority being entitled to receive annual payments up to a maximum of $72 million.  In all other material respects, the terms of the amended and original VSAs are substantially similar.  In late 2007, Entergy announced a proposed spinoff of the subsidiaries.  While Entergy initially indicated that it was of the view that the spinoff would cause the VSAs to be terminated, discussions between NYPA and Entergy produced a subsequent accord whereby the parties agreed that such spinoff would not constitute a terminating event for the VSAs.  Consequently, for purposes of the 2009-2012 financial plan it has been assumed that the maximum payment of $72 million will be garnered in each year.  

 

Operations and Maintenance Expenses

NYPA’s O&M plan for 2009 – 2012 assumes planned wage increases, stabilized benefit costs, planned maintenance outages and non-recurring spending. Exclusive of planned maintenance outage costs and non-recurring spending, the anticipated budget increases approximately at the rate of inflation.


 

 


 

Operations and Maintenance Forecast by Cost Element
(in Millions)

 

 

 

 

 

 

         2009

         2010

         2011

         2012

Payroll

 

 

 

 

  Regular Pay

$139.4

$141.0

$145.3

$149.6

  Overtime

$8.3

$8.1

$8.3

$8.6

  Other Payroll

$2.2

$2.3

$2.4

$2.4

Total Payroll

$149.9

$151.4

$156.0

$160.6

 

 

 

 

 

Benefits

 

 

 

 

  Employee Benefits

$29.9

$30.3

$31.2

$32.1

  Pension

$11.3

$11.4

$11.8

$12.1

  FICA

$11.0

$11.1

$11.5

$11.8

Total Benefits

$52.2

$52.8

$54.4

$56.0

 

 

 

 

 

Materials/Supplies

$19.9

$20.1

$20.0

$22.0

 

 

 

 

 

Fees

$7.5

$7.7

$7.9

$8.1

 

 

 

 

 

Office & Station

$14.3

$14.5

$14.9

$15.3

 

 

 

 

 

Maintenance Repair &

 

 

 

 

Service Contracts

$87.9

$81.9

$85.2

$93.4

 

 

 

 

 

Consultants

$14.7

$15.2

$15.6

$16.1

 

 

 

 

 

Charges to:

 

 

 

 

  Outside Agencies

($11.5)

($11.9)

($12.2)

($12.6)

  Capital Programs

($38.7)

($39.9)

($41.1)

($42.3)

Total Charges

($50.3)

($51.8)

($53.3)

($54.9)

 

 

 

 

 

Research & Development

$8.3

$8.6

$8.9

$9.1

 

 

 

 

 

TOTAL NYPA O&M

$304.5

$300.3

$309.5

$325.8

 

 

Modifications to Proposed Budget and Financial Plan

The following is a comparison of the estimated net revenues between the proposed and approved budget and financial plans:

Year

Proposed Budget

& Financial Plan

(in Millions)

Approved Budget
& Financial Plan

(in Millions)

2009

$274.5

$173.1

2010

$286.7

$227.8

2011

$284.2

$257.0

2012

$292.0

$278.1

 

For the 2009 – 2012 period, the major drivers in the variance between the two plans are changes in forecasts of electric and fuel prices, and an increase in projected voluntary contributions to the State.  Additionally, hydroelectric generation in 2009 is forecasted to be about 1 TWH lower than the proposed budget estimate, significantly reducing market sales opportunities.

 

 

(d) Self – Assessment of Budgetary Risks

 

Regulatory Risks

On July 6, 2005, the U.S. Fish and Wildlife Service (‘‘FWS’’) initiated a status review under the Endangered Species Act (16 U.S.C. 1531 et seq.) to determine if listing the American eel as threatened or endangered is warranted. American eels are a fish species that migrate between freshwater and the ocean, and their wide range includes the Atlantic seaboard of the United States and Canada and the Great Lakes’ drainages.  In findings issued February 2, 2007, the FWS determined that such a listing is not warranted.  However, in the event the FWS were to determine in the future to list the American eel as threatened or endangered, such a determination could potentially result in significant additional costs and operational restrictions on hydroelectric generating facilities located within the range of the species, including the Authority’s St. Lawrence-FDR Project.

 

The Regional Greenhouse Gas Initiative (“RGGI”) is a cooperative effort by Northeastern and Mid-Atlantic states to reduce carbon dioxide emissions commencing in 2009.  Central to this initiative is the proposed implementation of a multi-state cap-and-trade program with a market-based emissions trading system.  The proposed program will require electricity generators to hold carbon dioxide allowances in a compliance account in a quantity that matches their total emissions of carbon dioxide for the compliance period.  The Authority’s Poletti, Flynn, SCPPs, and 500-MW Plant will be subject to the RGGI requirements.  Depending on the final program design and prices of the allowances, the costs of compliance to the Authority and other generators in the region could be significant. The first RGGI conducted cap-and-trade auction for CO2 allowances was held in the Fall this year.  An estimate of the RGGI costs has been incorporated into the 2009-2012 financial plan.

 

Legislative and Political Risks

A series of legislative enactments call for NYPA to subsidize business customers and the State’s general fund.  Legislation enacted into law, as part of the 2000-2001 State budget, as amended in subsequent years, provides that the Authority “as deemed feasible and advisable by the trustees,” is authorized to make “voluntary contributions” into the State treasury in connection with the Power for Jobs Program and to make certain reimbursement payments to Power for Jobs customers.  Through March 2008, the Authority made such voluntary contributions to the State in the aggregate amount of $424 million and also made the reimbursement payments to customers of $37 million for 2005, $46 million for 2006, and $42 million for 2007.  Reimbursement payments for 2008 are not expected to exceed $58 million.

 

In April 2008, additional legislation was enacted into law that extended the Power for Jobs Program through June 2009 and provided for an additional voluntary contribution of $25 million for the State Fiscal Year 2008-2009 while raising the cap on such voluntary contributions to $449 million.  The April 2008 legislation also authorized additional voluntary contributions, not related to the Power For Jobs Program, to be paid as deemed feasible and advisable by the Trustees in the amount of $60 million for State Fiscal Year 2008-2009 and in the amount of $35 million for each year in State Fiscal Years 2009-2010 and 2010-2011.

 

In November 2008, Governor Patterson announced a two-year deficit reduction plan in which it is proposed that the Authority would provide an additional $40 million to the State’s general fund during the current 2008-09 State fiscal year above that already outlined in current legislation.  Given the severe budget problems facing New York State at this time, the Authority expects to receive additional requests for the Authority to provide financial support to New York State.  Thus, for planning purposes, the 2009-2012 financial plan assumes that payments totaling approximately $100 million per year are made to New York State.

 

Approval of any such payments to subsidize the State’s general fund and/or to subsidize the customers requires legislation authorizing such payments and is conditional upon the Trustees’ determination that such payments are “feasible and advisable”. The Trustees’ decision as to whether and to what extent such payments are feasible and advisable will be made based on the exercise of their fiduciary responsibilities and in light of the requirements of the NYPA’s Bond Resolution, other legal requirements, and all the facts and circumstances known to them at the time of the decision.  Many of those circumstances are not known at the present time.

 

For the 2009-2012 financial plan, the Authority is presuming that continuation of service to the Market Supply Power business customers will remain a New York State priority.  Forecasted voluntary subsidies and payments to the Market Supply Power Customers and the State’s general fund are subject to the strictures and caveats of the preceding paragraph. Also, the modeling of such contributions should not be read to mean that the Authority believes such continuing subsidies are an appropriate way of promoting economic development in New York State. 

 

Pursuant to legislation enacted into law in April 2006, the Temporary Commission on the Future of New York State Programs for Economic Development (“Temporary Commission”) was established.  On December 1, 2006, the Temporary Commission reported their findings on how to best meet the energy cost needs of statewide businesses. Among the Temporary Commission’s recommendations include the centralization of the administration of the State’s power programs; that the proceeds of certain unallocated hydroelectric power of the Authority be dedicated to economic development; that the duration of certain types of power allocation contracts be lengthened; that the Authority facilitate the expansion of the State’s power infrastructure by continuing to enter into long term contracts with power producers for the construction of new generation and/or transmission facilities; the creation of stable funding sources for the State’s power programs, potentially including the State Treasury and dedicated funding from the Authority subject to the Authority’s bond covenants and reserve requirements; the expansion of geographic restrictions of certain Authority hydroelectric industrial programs; and  the redeployment of hydroelectric power provided by the Authority to the “rural and domestic” (i.e., residential) customers of National Grid, NYSEG and RG&E for statewide economic development purposes.    It is unclear at this point which, if any, of the Temporary Commission’s recommendations will be enacted into law and how they would affect NYPA’s estimated net revenues for the financial plan period.

 

Section 1011 of the Power Authority Act (“Act”) constitutes a pledge of the State to holders of Authority obligations not to limit or alter the rights vested in the Authority by the Act until such obligations together with the interest thereon are fully met and discharged or unless adequate provision is made by law for the protection of the holders thereof. Several bills have been introduced into the State Legislature, some of which propose to limit or restrict the powers, rights and exemption from regulation which the Authority currently possesses under the Act and other applicable law or otherwise would affect the Authority's financial condition or its ability to conduct its business, activities, or operations, in the manner presently conducted or contemplated by the Authority.  It is not possible to predict whether any of such bills or other bills of a similar type which may be introduced in the future will be enacted.  In addition, from time to time, legislation is enacted into New York law which purports to impose financial and other obligations on the Authority, either individually or along with other public authorities or governmental entities.  The applicability of such provisions to the Authority would depend upon, among other things, the nature of the obligations imposed and the applicability of the pledge of the State set forth in Section 1011 of the Act to such provisions.  There can be no assurance that the Authority will be immune from the financial obligations imposed by any such provision.

 

Actions taken by the State Legislature or the Executive Branch to extract greater contributions and which attempt to constrain the discretion of or bypass the Authority’s Trustees could negatively affect net revenues and possibly harm NYPA’s bond rating.

 

Hydroelectric Generation Risk

For the 2009-2012 financial plan period, NYPA’s net revenues are highly dependent upon generation levels at its Niagara and St. Lawrence-FDR Projects.  The generation levels themselves are a function of the hydrological conditions prevailing on the Great Lakes, primarily, Lake Erie (Niagara Project) and Lake Ontario (St. Lawrence-FDR).  Long-term generation levels at the two hydroelectric projects are about 20.0 terawatt-hours (“TWH”) annually.  The Authority’s estimated hydroelectric generation is 18.7 TWH in 2009; 19.4 TWH in 2010; 20.1 TWH in 2011; and 20.2 TWH in 2012..  However, these generation amounts are expected values and hydrological conditions can vary considerably from year to year.  For instance, during a recent nine year period, 1999-2007, hydroelectric generation was in a number of the years below the long-term average and manifested considerable volatility.

 


 

 

Net Hydroelectric Generation

1999

18.7

TWH

2000

18.6

TWH

2001

17.6

TWH

2002

19.7

TWH

2003

18.3

TWH

2004

20.4

TWH

2005

20.7

TWH

2006

20.3

TWH

2007

19.8

TWH

 

Poor hydrological conditions would adversely affect NYPA’s estimated net revenues for the Financial Plan horizon and would likely compel NYPA’s Trustees to lower or not approve any contributions to the discretionary subsidy policy described previously.

 

NYPA conducted high and low hydroelectric generation sensitivities for 2009 - 2012 that estimated the potential net revenues that could result over a reasonable range of hydroelectric generation occurrences.  The effects on estimated net revenues, assuming all other factors remain unchanged, were as follows:

 

 

Low Generation

High Generation

 

Hydroelectric Generation

NYPA Net Revenue (in Millions)

Hydroelectric Generation

NYPA Net Revenue (in Millions)

2009

17.5 TWH

$133.7

21.5 TWH

$297.8

2010

17.5 TWH

$160.1

21.5 TWH

$326.9

2011

17.5 TWH

$157.0

21.5 TWH

$332.3

2012

17.5 TWH

$180.5

21.5 TWH

$345.9

               

 

 

Electric Price and Fuel Risk

The Authority dispatches power from its generating facilities in conjunction with the NYISO. The NYISO coordinates the reliable dispatch of power and operates markets for the sale of electricity and ancillary services within New York State. The NYISO collects charges associated with the use of the transmission facilities and the sale of energy, capacity, and services through the markets that it operates and remits those proceeds to the owners of the facilities in accordance with its tariff and to the sellers of the electricity and services in accordance with their respective bids and applicable NYISO market procedures. Under the NYISO Open Access Transmission Tariff, certain charges for ancillary services (which include NYISO operating costs), congestion, losses, and a portion of the Authority’s transmission costs are assessed against the Authority and other entities responsible for serving ultimate customers. Because of the Authority’s active participation in the NYISO markets, such costs are significant and are currently being passed through to most Authority customers.

 

Under NYISO procedures, Load Serving Entities (‘‘LSEs’’) represent electricity end-users in dealings with the NYISO. The Authority is an LSE for large segments of its load in New York State and must ensure it has sufficient installed capacity to meet its customers’ needs and NYISO reliability rules, either through ownership of such capacity, bilateral installed capacity purchase contracts or auction purchases conducted by the NYISO.  As an LSE, the Authority is also obligated to ensure that it has enough energy to meet its customers’ energy needs. These needs can be met in the NYISO regime through the Authority’s own generation, bilateral purchases from others, or purchases of energy in the NYISO ‘‘day-ahead’’ market (‘‘DAM’’) (wherein bids are submitted for energy to be delivered the next day) or in the NYISO ‘‘real time’’ market. A bilateral purchase is a transaction where a generator or a power marketer that has access to power and an LSE agree upon a specified amount of energy being supplied to the LSE by the generator or power marketer at specified prices.

 

This procedure has provided the Authority with economic benefits from its units’ operation when selected by the NYISO and may do so in the future. However, such bids also obligate the Authority to supply the energy in question during a specified time period, which does not exceed two days, if the unit is selected. If a forced outage occurs at the Authority plant which is to supply such energy, then the Authority is obligated to pay during the Short Term Period (1) in regard to the Excess Energy amount, the difference between the price of energy in the NYISO real time market and the Market Clearing Price in the DAM, and (2) in regard to the Contract Energy amount, the price of energy in the NYISO real time market which is offset by the Contract Price. This real time market price may be subject to more volatility than the DAM price. The risk attendant with this outage situation is that, under certain circumstances, the Market Clearing Price in the DAM and the Contract Price may be well below the price in the NYISO real time market, with the Authority having to pay the difference. In times of maximum energy usage, this cost could be substantial. This outage cost risk is primarily of concern to the Authority in the case of its Poletti unit and the 500-MW Project because of their size, nature, and location.

 

In addition to the risk associated with Authority generation bids into the DAM, the Authority could incur substantial costs in times of maximum energy usage in purchasing replacement energy for its customers in the DAM or through other supply arrangements to make up for lost energy due to an extended outage of its units and non-performance of counterparties to energy supply contracts.

 

In April 2002, the Authority created the position of Vice President, Chief Risk Officer—Energy Risk Assessment and Control. This officer reports to the Executive Vice President and Chief Financial Officer and is responsible for establishing policies and procedures for identifying, reporting and controlling energy-price- and fuel-price-related

risk exposure and risk exposure connected with energy- and fuel-related hedging transactions. This type of assessment and control has assumed greater importance in light of the Authority’s participation in the NYISO energy markets and the sale of its two nuclear plants, and the commercial operation of its 500-MW Project.  In recent years, the Authority has increased its dependence on purchased power to meet its customers’ needs. This has made the Authority more susceptible to risks posed by increases in purchased power costs and fuel costs. To deal with this greater risk, the Authority has obtained and is in the process of obtaining power purchase agreements (or their financial equivalents) to meet a significant portion of its customer load.  Even with these planned arrangements, the Authority will still have exposure to purchased power price risks to the extent it purchases power in the NYISO day-ahead and real-time markets. Also, with the addition of the Authority’s 500-MW Project, the Authority will face increased fuel price risk to the extent it uses its own fossil-fuel generation to meet its customers’ needs. The risk management program implemented by the Vice President, Chief Risk Officer—Energy Risk Assessment and Control is designed to mitigate such risks.  The Authority is also pursuing an initiative to develop and implement a comprehensive enterprise-wide risk management program.

 

Litigation Risk

In 1982 and again in 1989, several groups of St. Regis Mohawk Indians filed lawsuits against the State, the Governor of the State, St. Lawrence and Franklin counties, the St. Lawrence Seaway Development Corporation, the Authority and others, claiming ownership to certain lands in St. Lawrence and Franklin counties and to Barnhart, Long Sault and Croil islands. These islands are within the boundary of the Authority’s St. Lawrence-FDR project and significant project facilities are located on Barnhart Island. Settlement discussions were held periodically between 1992 and 1998. In 1998, the Federal government intervened on behalf of the Mohawk Indians.

 

On May 30, 2001, the United States District Court (the Court) denied, with one minor exception, the defendants’ motion to dismiss the land claims. However, the Court barred the Federal government and one of the tribal plaintiffs, the American Tribe of Mohawk Indians (the Tribe) from re-litigating a claim to 144 acres on the mainland which had been lost in the 1930s by the Federal government. The Court rejected the State’s broader defenses, allowing all plaintiffs to assert challenges to the islands and other mainland conveyances in the 1800s, which involved thousands of acres.

 

On August 3, 2001, the Federal government sought to amend its complaint in the consolidated cases to name only the State and the Authority as defendants. The State and the Authority advised the Court that they would not oppose the motion but reserved their right to challenge, at a future date, various forms of relief requested by the Federal government.

 

The Court granted the Federal government’s motion to file an amended complaint. The tribal plaintiffs still retain their request to evict all defendants, including the private landowners. Both the State and the Authority answered the amended complaint. In April 2002, the tribal plaintiffs moved to strike certain affirmative defenses and, joined by the Federal government, moved to dismiss certain defense counterclaims.  In an opinion, dated July 28, 2003, the Court left intact most of the Authority’s defenses and all of its counterclaims.

 

Thereafter settlement discussions produced a land claim settlement, which if implemented would include, among other things, the payment by the Authority of $2 million a year for 35 years to the tribal plaintiffs, the provision of up to 9 MW of low cost Authority power for use on the reservation, the transfer of two Authority-owned islands, Long Sault and Croil, and a 215-acre parcel on Massena Point to the tribal plaintiffs, and the tribal plaintiffs withdrawing any judicial challenges to the Authority’s new license, as well as any claims to annual fees from the St. Lawrence-FDR project.  Members of all tribal entities voted to approve the settlement, which was executed by them, the Governor, and the Authority on February 1, 2005.  The settlement required, among other things, Federal and State legislation to become effective which has not yet been enacted.

 

Litigation in the case had been stayed to permit time for passage of such legislation and to await decisions of appeals in two relevant New York land claims litigations, involving the Cayuga and Oneida Nations, to which the Authority was not a party.  In May 2006, the U.S. Supreme Court declined to review the U.S. Court of Appeals’ (Second Circuit) decision in Cayuga Indian Nation et al. v Pataki et al. (2005) that had reversed a verdict awarding the Cayugas $248 million in damages and also dismissed the Cayuga land claim.  The basis for the Second Circuit’s dismissal of the land claim was that the Cayugas had waited too long to bring their land claim (laches).  The Authority had raised the defense of laches in its answer in the St. Regis litigation and on November 26, 2006 the Authority and the State moved to dismiss the St. Regis Mohawks complaints as well as the United States’ complaint on similar delay grounds.  The Mohawks and the Federal government filed papers opposing those motions in July 2007, additional briefing by the parties occurred thereafter, and a decision on the defendants’ motion is pending.

 


 

(e) Revised Forecast of 2008 Budget

      (in  Millions)

 

 

 

Original Budget

      Forecast

        Variance

        Better/(Worse)

 

 

 

2008

       2008

        2008

Operating Revenues:

 

 

 

 

 

 

  Customer Revenues

$2,067.6

 

$2,038.1

($29.5)

 

  NYISO Market Revenues

$899.1

 

$1,140.8

$241.7

 

  Total Operating Revenues

$2,966.7

 

$3,178.9

$212.2

 

 

 

 

 

 

 

 

 

Operating Expenses:

 

 

 

 

 

 

  Purchased Power

($1,186.8)

 

($1,226.5)

($39.7)

 

  Fuel oil and gas

($537.4)

 

($610.6)

($73.2)

 

  Wheeling Expenses

($442.7)

 

($385.0)

$57.7

 

  O&M Expenses

($287.2)

 

($285.2)

$2.0

 

  Other Expenses

($165.9)

 

($301.7)

($135.8)

 

  Depreciation and Amortization

($175.4)

 

($172.6)

$2.8

 

Total Operating Expenses

($2,795.3)

 

($2,981.5)

($186.2)

 

 

 

 

 

 

 

 

 

NET OPERATING REVENUES

$171.3

 

$197.4

$26.1

 

 

 

 

 

 

 

 

 

Other Income:

 

 

 

 

 

 

  Investment Income

$58.5

 

$33.1

($25.4)

 

  Other Income

$93.7

 

$91.2

($2.5)

 

Total Other Income

$152.2

 

$124.3

($27.9)

 

 

 

 

 

 

 

 

 

Interest Expense:

 

 

 

 

 

 

  Interest & Other Expenses

($137.1)

 

($115.8)

$21.3

 

Total Interest Expense

($137.1)

 

($115.8)

$21.3

 

 

 

 

 

 

 

 

 

NET REVENUES

$186.4

 

$205.9

$19.5

 

 

(f) Reconciliation of 2008 Budget and 2008 Revised Forecast

 

Estimates of 2008 Net Revenues have increased mainly due to higher forecasted hydro generation (20.2 TWH in the updated forecast compared to 17.6 TWH in current year’s budget) at the Niagara and St. Lawrence-FDR projects.  The higher hydro generation results in increased market sales from these projects as well as decreased purchased power costs of substitute and alternative market purchases for a number of the projects’ customers.  Debt Interest expense is down due to decreases in variable interest rates.

 

Offsetting the effects of the higher hydro generation are increased market purchased power costs and increased fuel expenses for NYPA’s customers due to higher commodity prices.  The Other Expenses category increased significantly, primarily because of an unbudgeted $60 million payout to the New York State government.  Investment Income has decreased due to mark-to-market losses engendered by turmoil in the debt markets and because of reduced earnings from lower short-term interest rates that have resulted from Federal Reserve actions.

 


 

(g) Statement of 2007 Financial Performance

      (in Millions)

 

 

 

 

   Original Budget

          Actual

   Variance

   Better/(Worse)

 

 

 

   2007

          2007

   2007

Operating Revenues:

 

 

 

 

 

 

  Customer Revenues

$1,850.1

 

$1,852.3

$2.2

 

  NYISO Market Revenues

$919.0

 

$1,054.7

$135.7

 

  Total Operating Revenues

$2,769.2

 

$2,907.0

$137.9

 

 

 

 

 

 

 

 

 

Operating Expenses:

 

 

 

 

 

 

  Purchased Power

($1,059.6)

 

($1,182.5)

($122.9)

 

  Fuel oil and gas

($522.7)

 

($534.8)

($12.1)

 

  Wheeling Expenses

($323.7)

 

($327.5)

($3.8)

 

  O&M Expenses

($268.5)

 

($268.4)

$0.1

 

  Other Expenses

($137.6)

 

($237.6)

($100.0)

 

  Depreciation and Amortization

($176.5)

 

($179.4)

($2.9)

 

Total Operating Expenses

($2,488.5)

 

($2,730.2)

($241.7)

 

 

 

 

 

 

 

 

 

NET OPERATING REVENUES

$280.6

 

$176.8

($103.8)

 

 

 

 

 

 

 

 

 

Other Income:

 

 

 

 

 

 

  Investment Income

$27.2

 

$139.6

$112.4

 

  Other Income

$28.5

 

$28.3

($0.2)

 

Total Other Income

$55.7

 

$167.9

$112.2

 

 

 

 

 

 

 

 

 

Interest Expense:

 

 

 

 

 

 

  Interest Expense

($129.2)

 

($110.0)

$19.2

 

Total Interest Expense

($129.2)

 

($110.0)

$19.2

 

 

 

 

 

 

 

 

 

NET REVENUES

$207.2

 

$234.8

$27.6

 

 

 

(h) Employee Data – number of employees, full-time, FTEs and functional classification

 

NYPA AUTHORIZED POSITIONS

 

 

 

 

 

 

 

 

2009

2010

2011

2012

 

 

 

 

 

 

   Headquarters

619

626

626

626

   Power Generation*

834

810

784

784

   Transmission

207

207

207

207

TOTAL

1660

1643

1617

1617

 

 

 

 

 

 

* Includes the anticipated retirement of the Poletti plant in 2010.

 

 

(i)  Gap-Closing Initiatives – revenue enhancement or cost-reduction initiatives

 

As the Authority is projecting positive net revenues for the 2009-2012 financial plan period, there are no planned gap-closing programs.

 

 

 

 

(j)  Material Non-recurring Resources – source and amount

 

See discussion in “Other Income” section.

 

 

(k) Shift in Material Resources

 

There are no anticipated shifts in material resources from one year to another.

 

 

(l) Debt Service

 

Projected Debt Outstanding (FYE)

(in Thousands)

 

 

 

 

 

 

 

 

2009

2010

2011

2012

Revenue Bonds

 

 

 

 

 

Series 2000A

 

      77,215

      77,215

      77,215

      77,215

Series 2002A

 

    144,655

    120,560

      95,625

      69,450

Series 2003A

 

    204,785

    200,310

    195,645

    190,770

Series 2006A

 

    144,315

    133,845

    122,970

    111,660

Series 2007A

 

      82,025

      82,025

      82,025

      82,025

Series 2007B

 

    256,710

    256,710

    256,710

    256,710

Series 2007C

 

    263,710

    263,710

    263,710

    263,710

Total Revenue Bonds

 

 1,173,415

 1,134,375

 1,093,900

 1,051,540

 

 

 

 

 

 

Adjustable Rate Tender Notes

 

    137,505

    130,500

    122,935

    114,765

 

 

 

 

 

 

Commercial Paper Notes

 

 

 

 

 

Series 1

 

    291,376

    328,978

    393,740

    507,972

Series 2

 

    265,840

    193,890

    145,065

    125,425

Series 3

 

      64,743

      60,842

      45,329

      44,146

Extendible - Series 1

 

      80,000

      75,000

      70,000

      65,000

Total Commercial Paper Notes

 

    701,959

    658,710

    654,134

    742,543

 

 

 

 

 

 

GRAND TOTAL

 

 2,012,879

 1,923,585

 1,870,969

 1,908,848

 


 

 

Planned Use of Debt Issuances

(in Thousands)

 

 

 

 

 

 

 

 

Assumed

              Project /

           Description

TYPE

Amount

Interest Rate

 

 

 

 

 

 

Period January 1, 2009 - December 31, 2009

 

 

 

 

No New Debt Anticipated for 2009

 

 

 

 

 

 

 

 

 

 

 

Period January 1, 2010 - December 31, 2010

 

 

 

 

Tax Exempt Commercial Paper

$37,602.0

2.80%

Energy Services Program

 

 

 

 

Taxable Commercial Paper

$2,000.0

4.30%

Energy Services Program

 

 

 

 

TOTAL ISSUED 2010

$39,602.0

 

 

 

 

 

 

 

 

 

 

Period January 1, 2011 - December 31, 2011

 

 

 

 

Tax Exempt Commercial Paper

$64,762.0

3.80%

Energy Services Program

 

 

 

 

Taxable Commercial Paper

$3,000.0

5.80%

Energy Services Program

 

 

 

 

 

 

TOTAL ISSUED 2011

$67,762.0

 

 

 

 

 

 

 

 

 

 

Period January 1, 2012 - December 31, 2012

 

 

 

 

Tax Exempt Commercial Paper

$114,232.0

4.10%

Energy Services Program

 

 

 

 

Taxable Commercial Paper

$5,000.0

6.20%

Energy Services Program

 

 

 

 

 

 

TOTAL ISSUED 2012

$119,232.0

 

 

 

 

 

 

 

 

 

 

Note:  The full faith and credit of the Authority are pledged for the payment of bonds and notes in accordance with their terms and provisions of their respective resolutions.  The Authority has no taxing power and its obligations are not debts of the State or any political subdivision of the State other than the Authority.  The Authority's debt does not constitute a pledge of the faith and credit of the State or of any political subdivision thereof, other than the Authority.


 

Debt Service as Percentage of Pledged Revenues (Accrual Based)

(in Thousands)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2009

 

2010

 

2011

 

2012

 

 

 

 

 

 

 

 

 

 

 

 

 

Revenue Bonds

 

    Debt Service

% of Rev.

 

     Debt Service

% of Rev.

 

     Debt Service

% of Rev.

 

     Debt Service

% of Rev.

Series 2000A

 

$4,054

0.13%

 

$4,054

0.14%

 

$4,054

0.12%

 

$4,054

0.11%

Series 2002A

 

$30,970

1.01%

 

$30,939

1.03%

 

$30,722

0.90%

 

$30,767

0.87%

Series 2003A

 

$15,742

0.51%

 

$15,741

0.53%

 

$15,741

0.46%

 

$15,742

0.45%

Series 2006A

 

$17,231

0.56%

 

$17,232

0.58%

 

$17,235

0.51%

 

$17,229

0.49%

Series 2007A

 

$3,896

0.13%

 

$3,896

0.13%

 

$3,896

0.11%

 

$3,896

0.11%

Series 2007B

 

$15,152

0.49%

 

$15,152

0.51%

 

$15,152

0.45%

 

$15,557

0.44%

Series 2007C

 

$12,836

0.42%

 

$12,836

0.43%

 

$12,836

0.38%

 

$12,836

0.36%

Total Revenue Bonds

 

$99,880

3.26%

 

$99,850

3.33%

 

$99,635

2.93%

 

$100,081

2.84%

 

 

 

 

 

 

 

 

 

 

 

 

 

Adjustable Rate Tender Notes

 

$9,515

0.31%

 

$11,100

0.37%

 

$12,733

0.37%

 

$13,519

0.38%

 

 

 

 

 

 

 

 

 

 

 

 

 

Commercial Paper Notes

 

 

 

 

 

 

 

 

 

 

 

 

Series 1

 

$5,914

0.19%

 

$9,305

0.31%

 

$14,454

0.42%

 

$19,161

0.54%

Series 2

 

$74,471

2.43%

 

$58,154

1.94%

 

$30,160

0.89%

 

$32,957

0.93%

Series 3

 

$6,199

0.20%

 

$6,401

0.21%

 

$19,670

0.58%

 

$7,701

0.22%

Extendible - Series 1

 

$6,700

0.22%

 

$7,400

0.25%

 

$8,000

0.24%

 

$7,975

0.23%

Total Commercial Paper Notes

 

$93,284

3.04%

 

$81,260

2.71%

 

$72,284

2.12%

 

$67,794

1.92%

 

 

 

 

 

 

 

 

 

 

 

 

 

Grand Total Debt Service

 

$202,678

6.61%

 

$192,210

6.42%

 

$184,652

5.43%

 

$181,394

5.14%

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: NYPA has no legal limit with regards to debt issuance.

 

 

 

 

 

 


 

 

Scheduled Debt Service Payments (Accrual Based)

 

 

 

 

 

 

 

 

 

          Outstanding (Issued) Debt

 

 

 

 

 

          Principal

            Interest

         Total

 

 

 

 

2009

           122,686,545

       79,991,905

       202,678,450

2010

           107,379,160

       84,261,586

       191,640,746

2011

             93,981,268

       88,214,039

       182,195,307

2012

             89,036,543

       86,086,536

       175,123,079

 

 

 

 

 

 

 

 

 

          Proposed Debt

 

 

 

 

 

          Principal

            Interest

         Total

 

 

 

 

2009

                           -  

                    -  

                     -  

2010

                           -  

            569,428

             569,428

2011

                           -  

         2,456,334

          2,456,334

2012

                           -  

         6,270,568

          6,270,568

 

 

 

 

 

 

 

 

 

          Total Debt

 

 

 

 

 

          Principal

            Interest

         Total

 

 

 

 

2009

           122,686,545

       79,991,905

       202,678,450

2010

           107,379,160

       84,831,014

       192,210,174

2011

             93,981,268

       90,670,373

       184,651,641

2012

             89,036,543

       92,357,104

       181,393,647

 


 

(m) Capital Investments and Sources of Funding

 

The Authority currently estimates that it will expend approximately $1,258.7 million for various capital improvements over the financial plan period 2009-2012. The Authority anticipates that these expenditures will be funded using existing construction funds, internally-generated funds and additional borrowings. Such additional borrowings are expected to be accomplished through the issuance of additional commercial paper notes and/or the issuance of long-term fixed rate debt.  Projected capital requirements during this period include:

 

(in Millions)

       2009

      2010

       2011

       2012

 

 

 

 

 

Niagara Relicensing

$7.2

$7.2

$7.2

$7.2

St. Lawrence Relicensing

$14.3

$2.6

$2.2

$1.8

Niagara LPGP and STL-FDR Life Extension and Modernization

$19.8

$19.6

$19.0

$69.7

MA1 and MA2 Transmission Line

$0.0

$0.0

$0.0

$34.0

Blenheim-Gilboa Life Extension and Modernization

$20.5

$22.4

$7.8

$0.0

Energy Services & Technology

$120.6

$130.0

$150.0

$200.0

Other

$122.7

$120.2

$77.5

$75.2

TOTAL

$305.1

$302.0

$263.7

$387.9

 

 

 

 

 

 

 


 

 

 

 

Certification of Assumptions and Method of Estimation for

Budget and Financial Plan 2009-2012 in accordance with the

Comptroller’s Regulation § 203.9 Certification

 

 

 

December 16, 2008

 

To the Board of Trustees

Power Authority of the State of New York

            ­­­­­­­­­­­­­­­­­­­­

 

To the best of my knowledge and belief after reasonable inquiry, I, the undersigned, certify that the “Authority’s Method of Estimation for Budget and Financial Plan 2009-2012” is based on reasonable assumptions and methods of estimation and that the regulations enumerated in Part 203, “Budget and Financial Plan Format, Supporting Documentation and Monitoring - Public Authorities” have been satisfied.

 

 

                                                                       

Gil Quiniones

Chief Operating Officer